4.
Drill four
Ф
8 holes at the mark point, the depth is not less than 55mm.
5.
Knock four explosion bolt into
Ф
8 holes (As the chart 5.8b below).
6.
Hang the energy storage machine on the four setscrews (As the chart 5.8c below).
7.
Lock the nut of setscrew (As the chart 5.8d below).
8.
The whole installation has finished.
a)
b) c)
d)
Chart 5.8