Chart 5.19
Chart 5.20
Note:
We suggest the distance between battery and SPH no longer than 1.5m, and the power line area must be
larger than 5 AWG.
5.4.4 Connection of CT terminal
There is a CT in SPH inverter monitoring the power consumption situation of residential users, the CT
terminal connection steps are as follows:
1.
Unscrew the swivel nut from the cable gland.
2.
Thread the swivel nut over the “CT” cable.
3.
Press the cable support sleeve out of the cable gland.
4.
Remove the filler plug from the cable support sleeve.
5.
Route the “CT” cable through an opening in the cable support sleeve.
6.
Thread the “CT” cable through the cable gland.
7.
Insert the RJ45 plug of the network cable into the “CT” pin connector on the inverter until it snaps into
place.