1.
Meter and CT can’t be installed at same time, please set the sensor model when selecting CT or
electricity meter, please refer to section 6.3.3 for details.
2.
Meter must be provided by Growatt. If not, maybe meter can’t communicate with SPH inverter.
3.
The more detail describe of meter installation, please turn to meter user manual.
5.4.6 Connection of communication terminal for lithium battery (CAN)
When using CAN communication with lithium batteries (for example PYLON US2000B), connect lithium
battery terminal (RJ45) steps as follows:
1.
Unscrew the swivel nut from the cable gland.
2.
Thread the swivel nut over the “CAN” cable.
3.
Press the cable support sleeve out of the cable gland.
4.
Remove the filler plug from the cable support sleeve.
5.
Route the “CAN” cable through an opening in the cable support sleeve.
6.
Thread the “CAN” cable through the cable gland.
7.
Insert the RJ45 plug of the network cable into the “CAN” pin connector on the inverter until it snaps into
place.
8.
If no other cables need to be installed, lock the waterproof cover to the inverter with screws.
9.
Screw the swivel nut onto the waterproof cover.
Chart 5.28