Commissioning
6
Installation
5.1 Basic installation requirements
5.2 Installation requires tools and
RJ 45 terminal sequence of the
LAN line
5.3 Installation Instructions
5.4 Grounding connection
SPH System electrical Connection
5.5
5
6.1 Commissioning of SPH
6.2 Operation modes
6.3 Country setting
6.4 Display and button
6.5 Communication
Start-up and shut
down SPH system
7
7.1 Start-up the SPH system
7.2 Disconnect the SPH system
Attention of the
installation
environment,
maintenance and
cleaning
8
Fault removal
9
12.1 Dismantling the energy storage
12.2 Packing the SPH inverter
12.3 Storing SPH inverter
12.4 Disposing of the SPH inverter
Decommissioning
EU Declaration
of
Conformity
Manufacturer
Warranty
12
10
11
Product specification
13
13.1 Growatt SPH series energy
storage machine product
specification
13.2 DC input terminal parameter
13.3 Torque
13.4 Appendix
Certificate
14
Contact
15