11
12
5
Installation
5.1 Basic installation requirements
Chart 5.2
E. Battery installation option is not far away from the position of SPH, the length
between SPH and battery should not be more than 1.5m.
F. The ambient temperature should be -25
℃ ~
60
℃
G. SPH can be installed in vertical or lean back on plane, please refer to the below
A. The installation location must be suitable for SPH's weight for a long period time
B. The installation location must conforms with dimension of SPH
C. Do not install the unit on structures constructed of flammable or thermo labile
materials
D. The ingress Protection rate is IP65 and the pollution degree is Pd2. and SPH can't
be enclosed.Please refer to the below:
Chart 5.1
Chart 5.4
Chart 5.3
5.2 Installation requires tools and RJ 45 terminal sequence
of the LAN line
H. Installation position shall not prevent access to the disconnection means.
I. In order to ensure machine can run normally and easy to operate, please pay
attention to provide adequate space for SPH, please refer to below:
J. Do not install the machine near television antenna or any other antennas and
antenna cables
K. Don't install the machine in the living area
L. Be sure that the machine is out of the children's reach
M. Taking the battery fixing space into account, about the dimensions please
reference user manual
N. The inflammable and explosive dangerous goods must not be placed around
battery in case of cause serious danger.
When installing
,
we need to use tools as follow
,
prepare the follow tools before
installing
: