1.Loosen the plastic cover printed as "Load" counterclockwise, 
remove the three waterproof plugs, and reserve three holes.
2. Route the three load cables (L/N/PE) through the three holes, 
connect them to the load circuit breaker terminal and ground copper 
bar. The load breaker terminal screw torque is 17.5 in*lbs / 2 N*m, and 
the ground terminal screw torque is 13 in*lbs / 1.5N*m.
3.Finally, fasten the plastic cover clockwise. The wiring is shown on 
the right:

5.

System startup and shutdown operations

5

.

1

 

To start the system, please follow the following steps:

5

.

2

 

 Shut down the system, please refer to the following steps:

GR-UM-256-A-00

Download
Manual

Growatt New Energy

Shenzhen Growatt New Energy CO.,LTD

4-13/F,Building A,Sino-German(Europe) Industrial Park,
Hangcheng Ave, Bao’an District, Shenzhen, China

 +86 0755 2747 1942

www.ginverter.com

T
E    

service@ginverter.com

W

7.

Service and contact

When connecting the SYN 50-XH-1 to the Generator, we need to connect AC power cable and the dry signal cable.

1.Loosen the plastic cover printed as "Generator" counterclockwise, remove the three waterproof plugs, and reserve three holes.
2.Route the three generator cables (L/N/PE) through the three holes, connect them to the generator circuit breaker terminal and ground 
copper bar. The screw torque of the generator circuit breaker terminal is 17.5 in*lbs / 2 N*m, and the screw torque on the ground terminal is 
13 in*lbs / 1.5 N*m.
3.Finally, fasten the plastic cover clockwise. Wiring is shown as follows:

1.Route the two communication cables (DRY+/DRY-) through the COM hole and connect them to the CN6 terminal on the control board. 
The other end of the communication cable is connected to the signal control point of the generator.
2.Fasten the plastic cover with "COM" clockwise.
3. Finally, close the upper cover of the machine and lock it with screws, torque 31 in* lbs / 3.5 N*m. Connection mode is as follows:

1.Turn on the DC switch of the ARK battery. For details, Please refer to the ARK battery manual.
2.Turn on the DC switch of the inverter. For details, Please refer to the XH inverter manual.
3.Turn on the power grid switch, then turn on the inverter input breaker of the  SYN 50-XH-1, and observe whether the inverter and 
battery indicators are displayed. If yes, go to the next step. If there is no display, it means that there is no mains supply. You need to 
press the POWER button of the ARK battery for a long time to wake up the battery. Please refer to the ARK battery installation manual. 
4.Through the upper computer of the inverter, turn on the inverter off-grid enabling function and set register 225 to 1. For detailed 
operations, please refer to the inverter user manual. 
5.After the preceding steps, if the indicator of the SYN 50-XH-1 is green, it indicates that the SYN 50-XH-1 is working properly.  

1.Disconnect the Inverter input breaker on the SYN 50-XH-1 and then disconnect the power grid switch.
2.Turn off the DC switch of the inverter. 
3.Turn off the DC switch of the ARK battery. 
4.Waiting for a while, and then all the indicators of the inverter, the ARK battery, and the SYN 50-XH-1 went out. The system is powered 
off completely.

Connection to the AC Loads

4.

 LED Description

System state

LED state

Green

Red

On-grid Mode

On

Off

Back-up Mode

Blinking

on 1s,off 1s

Off

No communication with the inverter

Off

Blinking

on 1s,off 1s

System fault

Off

On

Firmware upgrade

The yellow light blinks, on and off for one second

 3.2.3 Connecting SYN 50-XH-1 to the load

 3.2.4 Connecting  SYN 50-XH-1 to the Generator (optional)

ON

OFF

Inverter

L N

COM Port

XH Inverter SYS COM

SYN 50-XH-1 CN8

RS485 A

PIN 5

A

RS485 B

PIN 6

B

1.Loosen the plastic cover printed as "COM" on the machine counterclockwise, remove the waterproof plug, and reserve a hole.
2.Route the two communication cables of (A/B) through the hole, connect them to the CN8 terminal of the control board, connect the other 
end of the cable to the SYS COM terminal of the inverter, and tighten the screws. The following table lists the corresponding terminal pins. 
Wiring is shown as follows:

PE

N L

PE

SYS COM

COM

CN8

B

A

1

6

Connection communication cable to the XH Inverter

1

2

Backup Loads

ON

OFF

L

N

N

L

L PE

PE

Connection AC cable to the Generator

ON

OFF

PE N L

L

N

PE

Generator

Connect the dry signal of the generator diagram

GEN

COM

CN6

COM

NO

6.

Manual bypass operation

When SYN 50-XH-1 fails, it cannot be switched to the bypass state. In order to ensure that the household power supply can be manually 
switched to the mains bypass state

1.Shut down the entire system. For details, please refer to section 5.2.
2.Manually turn off the inverter switch and load switch (“OFF” indicates turn off state).
3.Use a Phillips screwdriver to loosen the firmware screws on the power bypass switch.
4.Slide the firmware to one end of the inverter switch.
5.Tighten the screws on the firmware, Turn on the power bypass switch (“ON” indicates turn on state). The torque of the screws is 10.5 
in*lbs / 1.2 N*m. The operation is shown below.
6.Power on the entire system. For details, please refer to section 5.1.

Bypass

Inverter Load

Bypass

Inverter Load

Bypass

Inverter Load

The operation is as follows:

2)To connect to the communication cable:

1)Connecting the AC cable:

2)Connecting the dry signal cable:

1

2

 

 

1

2

L

oad

Connection AC cable to the XH Inverter

“ON”state “OFF”state

Reviews: