19
Revision date: 08.30.18
106205_06_07_08
A
INSTALL END WALL FRAME — CONTINUED
Install End Wall Frame
1. Locate square tubing for base rail. See Quick Start section for
clarification. Construct base rail using 102897 tubes joined and cut to fit
between end rafter ground posts.
Base Tube
Ground
Post
QH1330
FA4482B
Secure all tube splices using an FA4482B Tek screw.
2. Position assembled base rail on ground between end rafter ground posts
at front of greenhouse and secure using an angle bracket (QH1330) at
each end and FA4482B Tek screws.
3. Install an FA4482B Tek screw at tube splice on back side to secure joint.
4. Place band clamps on end rafter above door as shown below.
DO NOT
TIGHTEN THE BOLTS AT THIS TIME.
5. Select tubing for two door jambs. Each support includes: One (1) 102897
swaged tube assembly cut to length and one (1) square-to-round tube
bracket (#104074). See diagram below and on next page.
A
6. Measure actual door and
use those dimensions
to mark door position on
base rail. Center door
in the end wall frame for
best results.
7. Measure distance
between top of base
rail and band clamp
to
determine length of first
door jamb.
NOTE:
If length is longer
than 99", add a section of
square tubing to the first
and secure the joint using
a Tek screw installed
through back of door
jamb assembly.
8. On door jamb, mark length determined in previous step and
subtract the
amount needed to account for the square-to-round tube connect bracket
,
which is attached to top of door jamb. See diagram on next page.