3
Revision date: 08.30.18
106205_06_07_08
Important Information
LOCATION
Choosing the proper location is an important step before you begin. The
following suggestions and precautions will help determine whether your
selected location is the best location.
• Never erect structure under power lines.
• Identify whether underground cables and pipes are present
before
preparing site or anchoring structure.
• Location should be away from structures that could cause snow to drift
on or around building.
• Do not position greenhouse where large loads such as snow and ice,
large tree branches, or other overhead obstacles could fall.
•
Always check local building codes before you begin and follow them
during construction.
SITE
After choosing a location, proper preparation of the site is essential. The
following site characteristics will help ensure structure integrity.
•
A level site is required
. Site must be level to properly and safely erect
and anchor the structure.
• Drainage: Water draining off structure and from areas surrounding site
should drain away to prevent damage to the site, the structure, and
structure contents.
WARNING:
The individuals assembling this structure are responsible
for designing and furnishing all temporary bracing, shoring and support
needed during the assembly process. For safety reasons, those who are
not familiar with recognized construction methods and techniques
must
seek the help of a qualified contractor.
ASSEMBLY PROCEDURE
Following the instructions as presented will help ensure proper assembly.
Failing to follow these steps may result in an improperly assembled and
anchored greenhouse and
can void all warranty and protection the
owner is entitled to
.
Steps outlining entire assembly are as follows:
1. Verify all parts are included in shipment. Notify customer service for
questions or concerns.
2. Read these instructions, the Must Read document, and all additional
documentation included with the shipment
before
you begin.
3. Gather tools, bracing, ladders (and lifts), and assistants needed to
assemble greenhouse.
4. Check weather
before
installing roof cover and any panels (if equipped).
Do not install on a windy or stormy day.
5. Re-evaluate location and site based on information and precautions
presented in documentation included with shipment.
6. Prepare site (if applicable).
7. Assemble frame components in the order presented.
8. Consult MUST READ document to properly anchor assembled frame.
9. Install end wall frame, cladding, and double doors as presented in this
guide.
10. Install flashing and roof and sidewall cladding (polycarbonate panels) —
See Assembly Guide #2.
11. Read and follow the care and maintenance information near the end of
this guide.