background image

2

Revision date: 02.17.17

TOOLS

The following list identifies the tools needed 

for assembly. Additional tools may be needed 

depending on application.
•  Tape measure and gloves.
•  Marker to mark locations on concrete pier.
•  Tool to punch holes through fabric or film. 
•  Wrench set and socket and ratchet set that 

includes 9/16" and 15/16" tools. 

•  3/4" masonry bit to drill mounting holes for 

3/4" anchor bolts.

READ THIS DOCUMENT BEFORE YOU BEGIN

This guide provides helpful hints and important information needed to safely assemble and properly use the 113170 EZ-Shade Tarp Arm.  Read and 

understand this guide before you begin.

Important Information

SAMPLE ASSEMBLY PROCEDURE 

Steps outlining the assembly process are as follows:
1.  Verify that all parts are included in the shipment. 

Notify customer service with questions or 

concerns.

2.  Read these instructions and all additional 

documentation included with the shipment 

before

 you begin.

3.  Gather the tools and assistants needed for 

assembly. 

BASIC CARE AND MAINTENANCE

Proper care and maintenance is important. Check 

the following items periodically:
•  Check all fasteners that secure cover material to 

the tarp arms to ensure they are tight.

•  Grease the pivot bolt every 6 months or more 

depending on use and conditions.

•  Check mounting hardware to ensure that all 

fasteners remain tight.

CUSTOMER-SUPPLIED MATERIALS

Additional parts, materials, and equipment are 

supplied by the customer/contractor:
•  Concrete for concrete piers. Minimal pier 

dimensions: Diameter: 12"; Height: 24"

•  Equipment to dig holes for piers and wrench to 

tighten anchor bolts.

•  Cover material to cover shelter.
•  Fasteners and materials to attach cover material 

to shelter frame.

•  Materials to construct an anchor for each pivot 

arm when cover material is pulled over frame.

SAFETY PRECAUTIONS

•  Use a portable GFCI (Ground Fault Circuit 

Interrupter) when working with electric power 

tools and cords. Use battery-powered tools if 

possible.

•  Exercise caution when using all tools.
•  Wear gloves and eye protection.

WARNING: THE 113170 EZ-SHADE 

TARP ARM AND ATTACHED COVER 

MATERIAL ARE HEAVY! FAILURE TO 

FOLLOW THESE PRECAUTIONS CAN 

RESULT IN PROPERTY DAMAGE OR 

SERIOUS INJURY:

 

•  DO NOT OPERATE THE PIVOT ARMS 

WITHOUT ASSISTANCE. NEVER 

OPERATE ALONE.

•  WIND CAN DAMAGE COVER AND 

PIVOT ARM ASSEMBLY. DO NOT 

ATTEMPT TO COVER OR UNCOVER THE 

SHELTER DURING WINDY OR STORMY 

CONDITIONS.

•  ANCHOR THE ASSEMBLY TO THE 

GROUND AFTER PULLING COVER OVER 

THE SHELTER. DO NOT ALLOW THE 

COVER MATERIAL AND PIVOT ARMS TO 

REMAIN UNSECURED AFTER COVER IS 

PULLED INTO PLACE.

•  INSPECT PIVOT ARMS AND ALL 

FASTENERS BEFORE EACH USE TO 

ENSURE ALL ARE TIGHT.

•  INSPECT THE AREA AROUND THE 

SHELTER TO ENSURE NO ONE OR 

NOTHING IS PRESENT WHEN PULLING 

OR REMOVING THE COVER MATERIAL.

•  GRAVITY PULLS PIVOT ARMS TOWARD 

THE GROUND. WIND CAN SLOW OR 

SPEED THIS MOVEMENT. 

EXERCISE 

CAUTION DURING OPERATION.

 

•  ANCHOR PIVOT ARMS TO THE 

GROUND WHEN EXTREME WEATHER IS 

EXPECTED.

WARNING: NEVER LEAVE THE PIVOT 

ARMS IN A VERTICAL OR ANGLED 

POSITION. ARMS MUST REMAIN ON 

THE GROUND AT ALL TIMES.

Summary of Contents for 113170

Page 1: ...rved Reproduction is prohibited without permission EZ Shade Tarp Arm 113170 Finished Grade Features Description Adjustable Arm Extends from 8 to 12 in 4 increments when anchored to base plate Maximum...

Page 2: ...customer contractor Concrete for concrete piers Minimal pier dimensions Diameter 12 Height 24 Equipment to dig holes for piers and wrench to tighten anchor bolts Cover material to cover shelter Faste...

Page 3: ...tarp arms are installed at each end of the frame and are anchored to customer supplied concrete piers Consult the remainder of this guide for additional details WARNING NEVER LEAVE THE PIVOT ARMS IN...

Page 4: ...odes for the region Minimum dimensions Diameter 12 Height 24 See diagram at the right Align piers with the center of the frame at each end 3 While concrete sets continue with the assembly ATTENTION Fo...

Page 5: ...struct the 113170 canopy arm assemblies Use these fasteners to attach the 113166 brackets Part Number Description Quantity FAG363B HEX CAP 3 8X3 ZINC EACH 8 FAME08B BULK FLATWASH 3 8 ZINC ea 16 FALB04...

Page 6: ...n Quantity FAG363B HEX CAP 3 8X3 ZINC EACH 4 FAME08B BULK FLATWASH 3 8 ZINC ea 8 FALB04B NUT 3 8 16 ZNC EACH 4 113165 TUBE CLAMP BUSHING 4 4 Continue with the next procedures Finished Grade Step 2 Fra...

Page 7: ...m of grease 2 Verify that concrete has set and mark the anchor bolt locations on the pier Use the pivot arm assembly to position the base correctly See diagram below 3 After marking the anchor bolt lo...

Page 8: ...lding then attach the other edge to the canopy arms 2 Take both pieces of the 8 u channel 111948 and cut each one in half Shade Material Step 1 Finished Grade Customer supplied baseboard to secure mat...

Page 9: ...ll bolts 5 Take a sharp tool and punch a hole in the materail at each bolt location 6 Insert the 5 16 carriage bolts throught the fabric clamp and install the flat washers and nuts Tighten all fastene...

Page 10: ...ting 3 IMPORTANT Anchor both pivot arms to the ground to prevent damage and injury when material is pulled over shelter With assistance lift one pivot arm with attached cover 1 WARNING NEVER LEAVE THE...

Page 11: ...11 Revision date 02 17 17 Customer Note Page...

Reviews: