background image

4

Revision date: 02.17.17

1

Assembly Instructions

CONSTRUCT CONCRETE PIERS FOR THE BASE PLATES

Complete these steps:
1.  Review the diagrams on this page to layout the pier positions at each end of building frame. 

 

NOTE:

 If building includes closed ends and pedestrian doors, review the drawings showing these features. Set the 

piers far enough away from the end walls to allow doors to fully open when shade material or film is pulled into place.

2.  Contact a local contractor to construct concrete piers. Follow all established codes for the region. Minimum dimensions: 

Diameter @ 12"; Height @ 24". See diagram at the right. 

Align piers with the center of the frame at each end.

3.  While concrete sets, continue with the assembly.

ATTENTION:

 For shelters with an end wall and door, position pier and pivot 

arm mounting base in a location that allows door to fully open when in use. 

Align center of pier with center of shelter. Set top of pier at finished grade.

Finished Grade

Pier

Center of Frame

Shelter with Door Installed

For most cold frame 

applications where 

no door is present 

in an end wall, 

minimum

 distance 

from center of end 

rafter to center of 

pier is 18".

Minimum is 18".

Shelter without Door

Top View 

Concrete 

Pier

12"

24" minimum

Concrete Pier

Finished Grade

Summary of Contents for 113170

Page 1: ...rved Reproduction is prohibited without permission EZ Shade Tarp Arm 113170 Finished Grade Features Description Adjustable Arm Extends from 8 to 12 in 4 increments when anchored to base plate Maximum...

Page 2: ...customer contractor Concrete for concrete piers Minimal pier dimensions Diameter 12 Height 24 Equipment to dig holes for piers and wrench to tighten anchor bolts Cover material to cover shelter Faste...

Page 3: ...tarp arms are installed at each end of the frame and are anchored to customer supplied concrete piers Consult the remainder of this guide for additional details WARNING NEVER LEAVE THE PIVOT ARMS IN...

Page 4: ...odes for the region Minimum dimensions Diameter 12 Height 24 See diagram at the right Align piers with the center of the frame at each end 3 While concrete sets continue with the assembly ATTENTION Fo...

Page 5: ...struct the 113170 canopy arm assemblies Use these fasteners to attach the 113166 brackets Part Number Description Quantity FAG363B HEX CAP 3 8X3 ZINC EACH 8 FAME08B BULK FLATWASH 3 8 ZINC ea 16 FALB04...

Page 6: ...n Quantity FAG363B HEX CAP 3 8X3 ZINC EACH 4 FAME08B BULK FLATWASH 3 8 ZINC ea 8 FALB04B NUT 3 8 16 ZNC EACH 4 113165 TUBE CLAMP BUSHING 4 4 Continue with the next procedures Finished Grade Step 2 Fra...

Page 7: ...m of grease 2 Verify that concrete has set and mark the anchor bolt locations on the pier Use the pivot arm assembly to position the base correctly See diagram below 3 After marking the anchor bolt lo...

Page 8: ...lding then attach the other edge to the canopy arms 2 Take both pieces of the 8 u channel 111948 and cut each one in half Shade Material Step 1 Finished Grade Customer supplied baseboard to secure mat...

Page 9: ...ll bolts 5 Take a sharp tool and punch a hole in the materail at each bolt location 6 Insert the 5 16 carriage bolts throught the fabric clamp and install the flat washers and nuts Tighten all fastene...

Page 10: ...ting 3 IMPORTANT Anchor both pivot arms to the ground to prevent damage and injury when material is pulled over shelter With assistance lift one pivot arm with attached cover 1 WARNING NEVER LEAVE THE...

Page 11: ...11 Revision date 02 17 17 Customer Note Page...

Reviews: