background image

5

Revision date: 02.17.17

2

Assembly Instructions

ASSEMBLE THE 113170 EZ-SHADE TARP ARM

Complete these steps:
1.  Cosult the diagram on this page and construct the 113170 canopy arm 

assemblies. Use these fasteners to attach the 113166 brackets.

Part Number

Description

Quantity

FAG363B

HEX CAP 3/8X3" ZINC EACH

8

FAME08B

BULK FLATWASH 3/8" ZINC (ea)

16

FALB04B

NUT 3/8-16 ZNC EACH

8

112317

2" SQUARE CAP PLUGS

4

2.  Install the 112317 plugs in each end of the assembled tube as shown.

113167

113166

113175

112317

Summary of Contents for 113170

Page 1: ...rved Reproduction is prohibited without permission EZ Shade Tarp Arm 113170 Finished Grade Features Description Adjustable Arm Extends from 8 to 12 in 4 increments when anchored to base plate Maximum...

Page 2: ...customer contractor Concrete for concrete piers Minimal pier dimensions Diameter 12 Height 24 Equipment to dig holes for piers and wrench to tighten anchor bolts Cover material to cover shelter Faste...

Page 3: ...tarp arms are installed at each end of the frame and are anchored to customer supplied concrete piers Consult the remainder of this guide for additional details WARNING NEVER LEAVE THE PIVOT ARMS IN...

Page 4: ...odes for the region Minimum dimensions Diameter 12 Height 24 See diagram at the right Align piers with the center of the frame at each end 3 While concrete sets continue with the assembly ATTENTION Fo...

Page 5: ...struct the 113170 canopy arm assemblies Use these fasteners to attach the 113166 brackets Part Number Description Quantity FAG363B HEX CAP 3 8X3 ZINC EACH 8 FAME08B BULK FLATWASH 3 8 ZINC ea 16 FALB04...

Page 6: ...n Quantity FAG363B HEX CAP 3 8X3 ZINC EACH 4 FAME08B BULK FLATWASH 3 8 ZINC ea 8 FALB04B NUT 3 8 16 ZNC EACH 4 113165 TUBE CLAMP BUSHING 4 4 Continue with the next procedures Finished Grade Step 2 Fra...

Page 7: ...m of grease 2 Verify that concrete has set and mark the anchor bolt locations on the pier Use the pivot arm assembly to position the base correctly See diagram below 3 After marking the anchor bolt lo...

Page 8: ...lding then attach the other edge to the canopy arms 2 Take both pieces of the 8 u channel 111948 and cut each one in half Shade Material Step 1 Finished Grade Customer supplied baseboard to secure mat...

Page 9: ...ll bolts 5 Take a sharp tool and punch a hole in the materail at each bolt location 6 Insert the 5 16 carriage bolts throught the fabric clamp and install the flat washers and nuts Tighten all fastene...

Page 10: ...ting 3 IMPORTANT Anchor both pivot arms to the ground to prevent damage and injury when material is pulled over shelter With assistance lift one pivot arm with attached cover 1 WARNING NEVER LEAVE THE...

Page 11: ...11 Revision date 02 17 17 Customer Note Page...

Reviews: