6
Revision date: 02.17.17
2
Assembly Instructions
ASSEMBLE THE 113170 EZ-SHADE TARP ARM—continued
3. Connect the canopy arms to the 113176 pivot arms.
ATTENTION:
Measure the height of the shelter frame and adjust the pivot
arms to be approximately 18" higher. See diagram for details.
Part Number
Description
Quantity
FAG363B
HEX CAP 3/8X3" ZINC EACH
4
FAME08B
BULK FLATWASH 3/8" ZINC (ea)
8
FALB04B
NUT 3/8-16 ZNC EACH
4
113165
TUBE CLAMP BUSHING
4
4. Continue with the next procedures.
Finished Grade
Step 2
Frame Height
+18"
Pivot Arm Assembly
Frame
height
plus
18".
Canopy Arm Assembly
113176
Pivot Arm
113165
After required length is
determined, align mounting
holes, insert 113165 bushings,
and secure connection using
fasteners identified in the table.
Maximum building
height: 10' to 10' 6".
Maximum building width: 20'.