11
Revision date: 12.30.16
Rafter Assembly–Optional Support Kit
2'-0"
10'-6 7/16" GROUND LEVEL TO
CENTER OF CROSS BEAM
30'-0" CENTER TO CENTER OF GROUND POSTS
WEB
(ST08475D13G17S1)
BAND CLAMP (106735)
BAND CLAMP (106735)
BAND CLAMP (106735)
GROUND LEVEL
BAND CLAMP (103856)
BAND CLAMP (103856)
WEB
(ST08475D13G17S1)
WEB
(ST05050D13G17S1)
WEB
(ST05050D13G17S1)
CROSS BEAM (S20P07237G14SS1)
CROSS BEAM (S20P126G14SGA)
CROSS BEAM (S20P126G14SGA)
RAFTER ASSEMBLY—Optional Support Kits
If the optional support kits were purchased, continue with the assembly steps that follow. Consult the diagrams
supplied with the rafter support kits for additional details. See also the diagram in the Quick Start section of this guide.
If the support kits were not purchased, continue with the frame assembly.
ATTENTION:
Support kit components are typically not installed for the end rafters when end wall framing is present.
Complete these basic steps:
1. Slide the band clamps into position on the assembled rafter.
2. Assemble the 2" x 2" square tube cross beam. Position cross beam band clamps as needed before installing bolts.
3. Verify dimensions and position of support kit components and install web components. Cross beam will run parallel
with the ground when installed properly.
4. Return to each band clamp and secure each clamp to the rafter using a Tek screw.
Install Tek screw in a
position that will not contact the cover when it is installed.
See Quick Start Section
for View details.
GROUND POST OPTION SHOWN ABOVE AND IN
MOST DIAGRAMS THROUGHOUT THIS GUIDE. SEE
QUICK START SECTION FOR ADDITIONAL GROUND
POST DETAILS.
NOTE:
If rafter with support kit is positioned where mid bay
diagonal cables are located, use this bolt (each end) to secure
108503 cable bracket to rafter. See Page 21 and Quick Start
diagrams for additional details.
ATTENTION:
Depending on position, bracket for roof
cable (108503) is secured using the mounting bolt that
connects cross beam of support kit to the rafter. See
cable positions on frame for additional detail.