13
Revision date: 12.30.16
Frame Assembly
FRAME ASSEMBLY (continued)
Use this diagram to properly position the purlins during the frame assembly. Side purlins will run just above the cross
beam of the rafter support kit components if equipped.
Center the ridge purlin on top of the rafters. Secure
using the QH1070 and FA4482 Tek screws. Install
one Tek screw through the side of the strap and
into the purlin pipe.
Finished Grade
Approximately
11
'
Secure side purlins at 11'
above the finished grade.
Secure purlin using QH1070
pipe straps at each end
rafter. Use 102546 cross
connectors at each mid
rafter position.