14
Revision date: 12.30.16
Purlin Pipe
Purlin Pipe
Frame Assembly
After setting the first end rafter and bracing it in place, set the second
rafter and add the purlins and purlin clamps. Consult the techincal
diagrams for connection details. Diagrams show the optional rafter
support package. Additional purchase required.
Frame shown may differ from actual frame.
After the first few rafters are set and connected
by purlins, remove the end rafter bracing and
continue with the frame assembly.
FRAME ASSEMBLY (continued)
IMPORTANT!
Secure each QH1070 pipe strap to the purlin pipe using one Tek screw. Secure
all 102546 cross connectors to the rafter and to the purlin pipe using Tek screws.
Secure all purlin pipe splices using two Tek screws. See photos on next page.