3
GROWSPAN
™
GOTHIC PREMIUM HIGH TUNNELS
Revision date: 01.08.21 108179_80_81_82_83_84H
ASSEMBLY PROCEDURE
Following the instructions as presented will help ensure the
proper assembly of your high tunnel. Failing to follow these
steps may result in an improperly assembled and anchored
high tunnel and will void all warranty and protection the
owner is entitled.
The steps outlining the assembly process are as follows:
1. Verify that all parts are included in the shipment. Notify
Customer Service for questions or concerns.
2. Read these instructions, the Must Read document, and
all additional documentation included with the shipment
before
you begin.
3. Gather the tools, bracing, ladders (and lifts), and
assistance needed to assemble the high tunnel.
4. Check the weather
before
you install the roof cover
and any panels (if equipped).
Do not install covers or
panels on a windy or stormy day.
5. Re-evaluate the location and site based on information
and precautions presented in the documentation
included with the shipment.
6. Prepare the site (if applicable).
7. Assemble the frame components in the order they are
presented in these instructions.
8. Assemble the frame including the struts (if equipped).
9. Consult the MUST READ document and properly
anchor the assembled frame.
10. Install the end wall framing. (These are optional items
for some high tunnels.)
11. Install, tighten, and secure the end wall end panels and
doors. (These are optional items for some buildings.)
12. Install, tighten, and secure the main cover. This applies
to fabric and film covers that stretch over the frame
assembly.
13. Attach the panel components to the main frame, install
the panel, and attach the anti-billow ropes.
14. Read the care and maintenance information at the end
of these instructions.
15. Complete and return all warranty information as
instructed.
BUILDING IDENTIFICATION
All buildings are identified by a building sku number (e.g.,
108179
HCD
). Use the following information to determine
the cover and side panel specifics of your building.
•
HCD: Film cover with Drop-Down Sides
•
HFD: 5.2 oz cover with Drop-Down Sides
•
HCRU: Film cover with Roll-Up Sides
•
HFRU: 5.2 oz cover with Roll-Up Sides
REQUIRED TOOLS
The following list identifies the main tools needed to
assemble the high tunnel. Additional tools and supports
may be needed depending on the structure, location, and
application.
• Tape measure or measuring device
• Marker to mark locations on the pipes
• Variable speed drill/driver (cordless with extra batteries
works best)
• Metal-cutting saw
• Wrenches and socket set, or an adjustable wrench
• Scissors, utility knife, or tin snips
• Hammers, gloves and eye protection
• Adjustable pliers and self-locking pliers
• Ladders, work platforms, and other machinery for lifting
designed to work safely at the height of the building
UNPACK AND IDENTIFY PARTS
The following steps will ensure that you have all the
necessary parts
before
you begin to assemble the high
tunnel frame.
1. Unpack the contents of the shipment and place where
you can easily inventory the parts. Refer to the Bill of
Materials/Spec Sheets.
2. Verify that all parts listed on the Bill of Materials/Spec
Sheets are present. If anything is missing or you have
questions, consult the Pictorial Parts Guide and all
diagrams for clarification, or contact Customer Service.
NOTE:
At this time, you do not need to open the plastic
bags containing smaller parts such as fasteners or
washers (if equipped).