GROWSPAN
™
GOTHIC PREMIUM HIGH TUNNELS
32
108185_86_87_88_89H Revision date: 01.08.21
INSTALL THE DROP-DOWN PANEL (continued)
9. Locate the 1/4" panel cord (CC5525) and cut a section
of cord to the length determined in the previous step.
10. Beginning at one end of the frame, move to the panel
conduit in the panel pocket, and make a small cut in
the material
below
the conduit and in line with a pulley.
11. Insert the end of the cord through the opening in the
panel and tie the cord to the conduit.
12. Take the free end of the cord, thread it through the
pulley,
wrap it over and around the drive pipe,
and
temporarily tie it to the drive pipe.
NOTE:
Verify that the cord is properly aligned with the
pulley and with the other end of the cord tied to the
panel conduit.
The cord must remain aligned for proper panel
operation.
13. Drive two (2) FA4482 Tek screws with neo-bonded
washers (102921) into the drive pipe where the cord
is located.
Do not fully seat the Tek screws to the
conduit.
Allow space to remain between the washer
and conduit.
14. Verify that the panel conduit remains against the
baseboard and pull the slack from the cord.
15. Weave the cord around the Tek screws as shown and
tighten the screws to secure the cord to the drive pipe.
16. Move to the next pulley position and repeat the steps to
measure, cut, and attach another cord to the panel and
drive pipe.
ATTENTION:
If the cord length was correct for the first,
cut additional cords to the same length. To ensure that
the panel remains level during operation, verify that
additional cords are wrapped around the drive pipe
in the same direction as the first cord. Continue this
pattern for all remaining cord-to-drive pipe connections.
Cord
Conduit in Panel
Knot
Panel
FA4482 Tek Screws with
102921 Neo-Bonded Washers