GROWSPAN
™
GOTHIC PREMIUM HIGH TUNNELS
56
108185_86_87_88_89H Revision date: 01.08.21
END FRAMING
10'-
0"
Guid
eP
ost Asse
mbly
166S09
9
166P02
4
Cran
kU
p Assembly
107923
4"x4
"S
up
pl
ie
d
By
Customer
106755
10792
3
Guid
eP
os
t
Assemb
ly
Guid
eP
os
t
Assembly
Cr
an
kU
p
Assembly
107923
107923
4"x4
"S
up
pl
ie
d
By
Customer
4"x4"
Su
pp
lied
By
Customer
106755
20'-
0"
10339
5
131P075
10339
6
131S07
5
131S07
5
131S07
5
131P043
Ground
Leve
l
Purlin Location
Purlin Location
Purlin Location
ATTENTION:
Construct the
end wall frame as shown with the vertical jambs extending
above the header 18" to 24"
.
This provides an anchor point for cables if you decide to install them now or in the future.
Header
CUST
OMER-SUPPLIED END
FRAME:
Construct the end
frame for the roll-up end panel using 4" x 4" wood posts. The door frame materials are supplied by the customer
. If
quality 4" x 4" lumber at the lengths needed is not available, construct 2-ply wood beams using 2" x 6" boards secured together with exterior grade bolts and nuts. Center the doorframe in the end wall and dig the holes for the doorjambs.
Stagger all joints. Do not align.
Use treated lumber and set in concrete for best results.