13
Revision date: 06.28.19
H5_30_Wide_HT_Roll_Up
Frame Assembly
After setting and bracing the first end rafter, set the second rafter
(Rafter Style B)
and slide the plain end of a purlin
pipe (131S075) into the 102857 end clamp at the locations shown. Consult technical diagrams for connection details.
Slide the free, swaged/tapered end of each purlin pipe through a 102547 cross connector placed over the second
rafter in the same positions. Evenly space purlins on frame as shown.
Space rafters at 48" on-center and tighten the clamps to lock rafters in place. Position plain end of each purlin tube
flush with outside edge of end rafter. See circled call outs in diagram below.
FRAME ASSEMBLY (continued)
Do not allow plain end of pipe
to extend beyond outer edge of
end rafter. See circled call outs.
Flush
View of End Rafter
102857
Clamp
Interior
Rafter
Purlin
View of Mid Rafter
102547
Clamp
Side Purlin Pipe
Actual frame may differ from example.
Style B
Rafter
Style A
Rafter
102856
End Clamp
102547
Cross Connector
SECURE CLAMPS TO PURLINS AND RAFTERS
After installing purlins and checking these are parallel with each other and
evenly spaced, secure each clamp to the purlin pipe and rafter pipe as shown.
Use FA4482B Tek screws to complete the connections.
Center this mid
purlin between
ridge and side
purlins.
Purlin
End Rafter
IMPORTANT:
Install screws in locations that will not contact the cover
when it is installed.
Tek
Screw