27
Revision date: 06.28.19
H5_30_Wide_HT_Roll_Up
Attach 111613Z144 U-Channel – 120' Long Only
Buildings 120' long include a two-panel main cover consisting of two
(2) identical sections. Each 62' section covers one-half of the frame.
Complete steps on this page to attach the 111613Z144 double
u-channel
to the middle rafter
. Installation is the same as attaching
102197 u-channel described on previous two pages.
NOTE:
If your building is less than 120' long skip this page and
continue with the next page.
Gather Parts:
• 111613Z144 Double U-Channel (for 120'
Long only)
• FA4472B Tek screws (spaced every 16")
• 100442 driver bit for drill
1. Take the 12' long pieces of 111613Z144 double u-channel and move to middle rafter.
ATTENTION:
Film rolls (and 5.2 oz cover panels) are 62' long; each covers half (60') of the frame. Installing
double u-channel in the wrong location will result in one roll (or panel) being too short. There are an equal number
of frame bays on each side of the u-channel when it is attached to middle/correct rafter.
Middle Rafter – Double U-Channel Position
120'
60'
60'
2. Position first double u-channel section on rafter at one ribbon board location and determine best position to allow
installation of cover material in side u-channel and over-the-top u-channel.
3. Secure u-channel to middle rafter using FA4472B Tek screws and 100442 driver bit. Space FA4472B Tek screws
at 16" on-center
.
4. Continue attaching the double u-channel to the middle rafter until you reach the ribbon board on the opposite side.
5. Measure and cut the final piece to length and attach to rafter.
6. Continue with the next procedure.
111613Z144
attached to
middle rafter.
Run u-channel down
to top of ribbon
board attached to
each side of frame.
111613Z144
(Dashed Line)