ASSEMBLE FRAME
After all ground posts are driven in place, assemble the
frame.
Gather the parts:
• All rafter assemblies and pre-marked purlins
• Band clamps (#QH1402)
• Cross connector (#102548)
• 5/16" x 2-1/2" bolts (FAG336B) & 5/16" nuts (FALB02B)
• Lifts, ladders, and assistants
• Rope or cable to temporarily brace rafters
1. Carefully stand the
first end rafter
,
slide a band clamp
onto each rafter leg
, and place the leg pipes in the first
set of ground posts.
Brace the rafter in place to keep it straight. Depending
on the frame size, a lift and additional assistants may
be needed. Consult Quick Start section for details.
Rafter shown differs in design.
2. Secure the leg pipes to the ground posts using the
5/16" x 2 1/2" machine bolts and nuts.
Rafter shown differs in design.
ATTENTION:
Stand rafter so nuts and bolts of end
clamps are to the inside of frame.
3. Use rope or cable to brace the rafter in position.
4. Carefully position the first interior rafter in place and
secure the leg pipes to the ground posts.
Rafter shown differs in design.
1st Interior Rafter
End Rafter
Inside of
Shelter
Outside of
Shelter
Rafter
Ground
Post
Band
Clamp