GROWSPAN
™
ROUND PRO GREENHOUSES AND SYSTEMS
20
Revision date: 01.23.19
INSTALL END WALL CLADDING
After installing end wall framing, attach polycarbonate panels. Steps that follow describe one way to complete end wall
panel installation.
Materials and parts needed to install end panels include:
• Polycarbonate Panels (See diagrams in Quick Start section for panel layout and identification.)
• White vent tape (104774) & foil tape (DH8007)
• Aluminum H-channel (113236Z096) & U-channel (104213)
• Tek screws (FA4484B) & Neo-bonded, galvanized washers (102921B)
Read the following information before starting:
• H-channel is used to join two (2) separate panels at seam.
• Tek Screws and galvanized washers are used to secure panels to each end wall frame column.
• Install polycarbonate panels with UV-protected side to the outside. Mark side with a marker or tape to identify after
removing protective film if needed.
ATTENTION:
Remove protective film from panels before installation.
Do not allow film to remain intact and in
direct sunlight;
doing so will make film difficult
if not impossible
to remove.
• During preparation, rest edges of panels on cardboard or other material to protect them from dirt and damage.
• Seal bottom edge of panels with white vent tape. Top is sealed with foil tape after installation.
• Consult polycarbonate panels (Quick Start section) for location and lengths of each panel. Diagrams are located at
the back of these instructions.
ATTENTION:
Position panels as shown on panel diagrams. If equipped, install all accessories (fans, vents, heaters, etc.)
after installing polycarbonate panels.
Evenly space Tek screws every 16".
Seal open cells of panel tops using foil
tape. Flashing will cover panel top and
sides when it is installed.
Apply vent tape along bottom of these
panels
and
install 104213 U-channel
over tape to finish bottom edge.
Attach 104213
U-channel to panel
edges adjacent to
door opening.