23
GROWSPAN
™
ROUND PRO GREENHOUSES AND SYSTEMS
Revision date: 01.23.19
4. Place panel in position, attach it to end wall framing
using FA4484B Tek screws and aluminum profile.
NOTE:
Space screws evenly
at 16"
on-center
when
securing panels. DO NOT USE WASHERS WHEN
SECURING H-CHANNEL TO END WALL FRAMING.
5. Prepare and install Panel B.
X
H-channel here –
outer edge of panel.
ATTENTION:
Mark UV-protected side of panel above
door to ensure proper installation in remaining end wall!
Use remainder of 4' x 8' side panel (A) adjacent to door
to cover same area along remaining side of door (B).
Install 104213 u-profile to finish bottom edge of
panels at base tube.
B
A
END PANEL INSTALLATION (continued)
6. Continue to prepare and install panels and aluminum
profile in the locations shown on end panel diagrams
(Quick Start section) to complete lower row of panels.
8. Cut upper edge of panels to correct length using end
rafter profile as a guide.
Tops of panels to be flush
with top of end rafter.
7. Prepare and install upper panels.
Vent tape is not
required for bottom edge of upper panels.
B
A
6' x 10'
6' x 10'
ATTENTION:
Photo shows removal of panel using
a power tool equipped with a round cutting bit.
(Greenhouse shown is used for illustration only. It is of
a different model.)
Cut upper panel
to proper length.