Deferrisation
GENO-mat FE-Z Deferrisation System
Order no. 025 153 940-inter Edited by: nkes-mrie G:\BA-153940-INTER_025_GENO-MAT_FE-Z.DOC
17
D Installation and operation
1 | General installation instructions
The installation site must provide adequate space. A foundation of a
sufficient size and adequate carrying capacity must be provided. The
required connections must be provided prior to the installation. For
dimensions and connection data, please refer to table D-1.
Table D-1: Installation data
GENO-mat FE-Z deferrisation system
20/10 25/13 30/14 40/17 40/18 50/19 60/20
Connection data
Nominal connection diameter
DN 25 (1")
DN 40 (1½“)
Min. drain connection
DN 50
DN 70
Nominal flow rate (depending on the iron
concentration)
[m³/h] 1.5
2.0
3.0
4.0
5.0
6.0
8.0
Power supply
[V]/[Hz
]
230/50
Connected load
[VA]
10
Protection/protection class
IP 54/
Dimensions and weights
1)
Total height
[mm] 1360
1620
1620
1900
1900
1870
2100
Exchanger tank
[mm] 210
260
340
370
420
550
620
Regeneration tank
[mm]
465
680
Height regeneration tank
[mm]
840
1010
Connection height/raw water piping
[mm] 1160
1420
1420
1710
1710
1680
1910
Connection height/pure water piping
[mm] 1210
1470
1470
1735
1735
1705
1935
Distance to wall
[mm] 200
230
280
280
300
365
405
Depth of foundation
[mm] 400
450
500
500
550
600
650
Length of foundation
[mm] 1850
1950
2050
2050
2100
2250
2350
Operating weight (incl. water)
[kg]
50
85
150
200
240
425
580
1)
All indications are approximate.
Note
:
For the installation of systems with optional accessories (see
chapter C, item 5), also observe the operation manuals supplied with
these components.