GRUNDIG Service
UMS 3000
1 - 2
Table of Contents
Page
General Section ................................ 1-2 … 1-10
Measuring Instruments / Equipment ............................................ 1-2
General Notes .............................................................................. 1-2
Technical Data ............................................................................. 1-3
Service Hints ................................................................................ 1-3
Operating Hints ............................................................................ 1-7
Disassembly Hints ..................................................................... 1-10
Adjustment Procedures ................................ 2-2
Layout of PCBs
and Circuit Diagrams ....................... 3-1 … 3-16
Block Diagram .............................................................................. 3-1
Wiring Diagram ............................................................................ 3-2
Power Supply and Audio Section ................................................. 3-3
CD Section ................................................................................... 3-6
MCU and Display Section ............................................................ 3-8
Radio Section ............................................................................. 3-12
Tape Section .............................................................................. 3-15
Exploded View and
Spare Parts List .................................. 4-1 … 4-3
Exploded View ............................................................................. 4-1
Spare Parts List ........................................................................... 4-2
Inhaltsverzeichnis
Seite
Allgemeiner Teil ............................... 1-2 … 1-10
Messgeräte / Messmittel .............................................................. 1-2
Allgemeine Hinweise .................................................................... 1-2
Technische Daten ........................................................................ 1-3
Servicehinweise ........................................................................... 1-3
Bedienhinweise ............................................................................ 1-4
Ausbauhinweise ......................................................................... 1-10
Abgleichvorschriften .................................... 2-1
Platinenabbildungen
und Schaltpläne ............................... 3-1 … 3-16
Blockschaltplan ............................................................................ 3-1
Verdrahtungsplan ......................................................................... 3-2
Netzteil und Audio-Teil ................................................................. 3-3
CD-Teil ......................................................................................... 3-6
MCU- und Display-Teil ................................................................. 3-8
Radio-Teil ................................................................................... 3-12
Cassetten-Teil ............................................................................ 3-15
Explosionszeichnung und
Ersatzteilliste ...................................... 4-1 … 4-3
Explosionszeichnung ................................................................... 4-1
Ersatzteilliste ................................................................................ 4-2
General Section
Measuring Instruments / Equipment
Signal generator
Sweep generator
Oscilloscope
Digital voltmeter
Distortion meter
Isulating Transformer
Fe Test Cassette 3150Hz/10kHz
General Notes
Before opening the cabinet disconnect the mains plug!
Attention: Observe the ESD safety regulations
Wiring
Before disconnecting any leads and especially the earth connecting
leads observe the way they are routed to the individual assemblies like
the chassis, mains switch panel, keyboard control panel, picture tube
panel, deflection unit, loudspeaker and so on.
On completion of the repairs the leads must be laid out as originally
fitted at the factory to avoid later failures or disturbances.
Carrying out Measurements
When making measurements on semi-conductors with an oscillo-
scope, ensure that the test probe is set to 10:1 dividing factor. If the
previous measurement was made on AC input, please note that the
coupling capacitor in the oscilloscope will be charged. Discharge via
the item being checked can damage the components.
Allgemeiner Teil
Messgeräte / Messmittel
Mess-Sender
Wobbelsender
Oszilloskop
Digitalvoltmeter
Klirrfaktormessgerät
Trenntrafo
Fe-Test-Cassette 3150Hz/10kHz
Allgemeine Hinweise
Vor dem Öffnen des Gehäuses zuerst den Netzstecker ziehen!
Achtung: ESD-Vorschriften beachten
Leitungsverlegung
Bevor Sie die Leitungen und insbesondere die Masseleitungen lösen,
muss die Leitungsverlegung zu den einzelnen Baugruppen beachtet
werden.
Nach erfolgter Reparatur ist es notwendig, die Leitungsführung wieder
in den werkseitigen Zustand zu versetzen um evtl. spätere Ausfälle
oder Störungen zu vermeiden.
Durchführen von Messungen
Bei Messungen mit dem Oszilloskop an Halbleitern sollten Sie nur
Tastköpfe mit 10:1 - Teiler verwenden. Außerdem ist zu beachten,
dass nach vorheriger Messung mit AC-Kopplung der Koppelkonden-
sator des Oszilloskops aufgeladen sein kann. Durch die Entladung
über das Messobjekt können Bauteile beschädigt werden.