11. Drive Motor and Motor Mount
PNEG-681CE
CE Compliant Series II Bucket Elevator
37
Torque Arm
1. Place the torque arm tube assembly on the head section by sliding the two (2) gussets of the torque
arm assembly between the head bearing angles.
2. Make sure the locking bolts face away from the head section.
3. Attach with the proper hardware.
NOTE:
On 16" and 24" elevators, the torque arm tube will slide in and out freely with the motor’s torque
causing a positive lock situation.
NOTE:
In 30" and large elevators, loosen the three (3) locking bolts and place the torque arm foot
mounting tube in the torque arm assembly such that the foot mounting bracket is to the side in
which the reducer will be mounted. Wait until the reducer is set on the shaft to re-tighten the
locking bolts.
Figure 11D Torque Arm (30"-48")
Ref #
Description
A
Motor
B
Reducer Drive
C
Gusset
D
Locking Bolts
E
Torque Arm Tube
F
Head Bearing Angles