4. Electric Operated Gate Installation
38
PNEG-1993
CE Compliant E-Series Chain Conveyors - All Models
Slack Chain Detector and Plug Switch
1. Attach the two (2) plates (C and D) with the guide (A) and install it on the cover (B) by using bolt (F)
2. Install the plates (E) to the cover as shown in
by using bolt (H) and nut (G).
Figure 4I Cover Installation
3. Install the limit switch (I) to the bracket (J) as shown in
Figure 4J Limit Switch Installation
Ref #
Part #
Description
A
ECCPS001
Guide
B
ECCPS002
Cover
C
ECCPS003
Plate
D
ECCPS004
Plate
E
ECCPS006
Plate
F
S-BHSM06020
Bolt, Flange Head M6 x 20 ZN
G
S-FNM06
Nut, Flange M6
H
S-FBM06025
Bolt, Flange Head M6 x 25 ZN
Ref #
Part #
Description
I
LSWA21
Limit Switch
J
ECCPS005
Switch Bracket