7. Roof
PNEG-1461
12' and 15' Bulk Feed Tank Series and Grain Hopper Tank Series
29
Peak Ring Collar to Roof Panels
Apply two (2) strips of caulking between peak ring and roof panels,
. Note that the peak ring
goes on the outside of the roof panels.
Figure 7C
Figure 7D
Figure 7E Peak Ring Collar Detail
Caulking
Peak ring
Caulking
5/16" x 3/4"
Bin bolt