64
PNEG-1461
12' and 15' Bulk Feed Tank Series and Grain Hopper Tank Series
12. Hopper Assembly
Hopper Sheets
When starting to attach hopper sheets to sidewall it is recommended that the first hopper sheet seam
be positioned halfway between leg positions. Lap the hopper sheets as shown
. Apply
two (2) strips of caulking on all seams at sidewall to hopper and hopper sheet to hopper sheet. Use
5/16" x 1-1/4" bin bolts (head to outside of tank) for attaching hopper sheets to bottom sidewall sheet.
Use truss head bolts to attach hopper sheet to hopper sheet. Be sure to place the head of the truss head
bolt on the inside of the hopper. Leave one hopper sheet out to allow room to install the hopper collar.
Be sure to use two (2) strips of caulking between hopper collar and hopper sheets, then put last hopper
sheet in place. After the collar is in place, attach the hopper braces and tighten all bolts.
Figure 12A
15' 60°
Install hopper sections. When starting to attach hopper sheets to sidewall it is recommended that the first
hopper sheet seam be positioned halfway between leg positions. Lap the hopper sheets as shown.
Use 5/16" x 1-1/4" bin bolts (head to outside of tank) for attaching hopper sheets to bottom sidewall sheet.
Use truss head bolts to attach hopper sheet to hopper sheet. Be sure to place the head of the truss head
bolt on the inside of the hopper. Caulk all seams (double bead). Remember, the hopper collar must be
installed before the last hopper section is in place. Clean any caulking, which may have squeezed out
during assembly, off the inside of the hopper. After the collar is in place, attach the hopper braces and
tighten all bolts.