12. Hopper Assembly
PNEG-1461
12' and 15' Bulk Feed Tank Series and Grain Hopper Tank Series
67
Hopper Collar Assembly
45° 22" Hopper collar (BLK-10854)
60° 22" Hopper collar (BLK-10342)
Install hopper collar before all hopper panels are assembled. Use 5/16" truss head bolts on all hopper
seams, as shown in the
. Be sure to caulk between the hopper collar and hopper panels. Refer
.
16" 45° Hopper extension panel (BLK-10697) (three (3) required)
16" 45° Hopper collar (BLK-10696)
16" 60° Hopper extension panel (BLK-10487) (three (3) required)
16" 60° Hopper collar (BLK-10489)
Prior to attaching the final hopper panel, assemble the hopper extensions (if utilized) on the hopper collar.
Use 5/16" truss head bolts and caulk all joints on the hopper extensions and collar. After completing this
assembly, attach to the hopper panels, using 5/16" truss head bolts. Be sure to caulk between hopper
extensions and hopper panels.
Figure 12G Hopper Seam Overlap Detail
Figure 12H 22" Hopper Collar
Figure 12I 16" Hopper Extensions and Collar