4. Install the auxiliary gate (70) using the flange bolts (60) and serrated flange nuts (9). Install the gate
clamp (12), carriage bolts (13), washers (14), nuts (9) and pin (15) at the outside of the intermediate
well.
NOTE:
• Make sure to provide gap in the intermediate well to install the bolts (60) and serrated
flange nuts (9) in the auxiliary gate before closing.
• Make sure to install the gate clamp (12), carriage bolts (13), flat washers (14), serrated
flange nuts (9) and pin (15) to the auxiliary gate with the auxiliary control rod at the
outside of the intermediate well.
IMPORTANT:
Carriage bolts (13) must be installed from top down as shown, if not, they will interfere
with the flooring and will not open.
Figure 3-15
Installing the auxiliary intermediate gate (For 8 in. and 10 in.)
9
5/16 in. serrated flange nut
15
5/16 x 1-3/4 in. roll pin
12
Control rod clamp
60
5/16 x 3/4 in. flange bolt
13
5/16 x 3/4 in. carriage bolts
70
Auxiliary gate
14
5/16 in. flat washer SAE
74
Auxiliary control rod
30
PNEG-2108
8" and 10" Standard Duty and IW Standard Duty