Chapter 2: Aeration Transition Instructions

Installation

Figure 2-1

Assembling the duct top and bottom plates

Figure 2-2

Connecting the duct top and bottom plate assemblies

14

PNEG-2286

Metric Aeration Transition

Summary of Contents for PNEG-2286

Page 1: ... Metric Aeration Transition Installation Manual PNEG 2286 Version 1 0 Date 11 07 19 PNEG 2286 ...

Page 2: ...ations photos and specifications in this manual are based on the latest information available at the time of publication The right is reserved to make changes at any time without notice 2 PNEG 2286 Metric Aeration Transition ...

Page 3: ...Precautions 5 Safety Guidelines 5 Safety Decals 9 Safety Sign off Sheet 10 Chapter 2 Aeration Transition Instructions 11 Parts List 11 Installation 14 Limited Warranty EME Grain Products 23 PNEG 2286 Metric Aeration Transition 3 ...

Page 4: ...NOTES 4 PNEG 2286 Metric Aeration Transition ...

Page 5: ...ecautions Topics Covered in this Chapter Safety Guidelines Safety Decals Safety Sign off Sheet Safety Guidelines Follow Safety Instructions Use Personal Protective Equipment PNEG 2286 Metric Aeration Transition 5 ...

Page 6: ...Chapter 1 Safety Precautions Do Not Enter Bin Prevent Roof Damage due to Vacuum Pressure 6 PNEG 2286 Metric Aeration Transition ...

Page 7: ...Chapter 1 Safety Precautions Unload Bin Correctly Do Not Overfill the Bin PNEG 2286 Metric Aeration Transition 7 ...

Page 8: ...hapter 1 Safety Precautions Stay Clear of Hoisted Equipment Sharp Edge Hazard Store Bin Sheets Properly Install and Operate Equipment Properly Rotating Auger Hazard 8 PNEG 2286 Metric Aeration Transition ...

Page 9: ...apter 1 Safety Precautions Safety Decals To replace a damaged or missing decal contact GSI to receive a free replacement Location Decal No Decal A DC 2306 B DC 2161 PNEG 2286 Metric Aeration Transition 9 ...

Page 10: ...Chapter 1 Safety Precautions C DC 2210 Safety Sign off Sheet Date Employee Name Supervisor Name ST 0007 10 PNEG 2286 Metric Aeration Transition ...

Page 11: ...2 Aeration Transition Instructions Topics Covered in this Chapter Parts List Installation Parts List PNEG 2286 Metric Aeration Transition 11 ...

Page 12: ...Chapter 2 Aeration Transition Instructions 12 PNEG 2286 Metric Aeration Transition ...

Page 13: ... list S No Part No Description 1 S BSTM06020 M06 x 20 self tapping screws 2 CH 6873 M Silicone free cartridge NOTE Use silicone free cartridge 2 to seal all joints and make sure there are no air leaks or water accumulation PNEG 2286 Metric Aeration Transition 13 ...

Page 14: ...er 2 Aeration Transition Instructions Installation Figure 2 1 Assembling the duct top and bottom plates Figure 2 2 Connecting the duct top and bottom plate assemblies 14 PNEG 2286 Metric Aeration Transition ...

Page 15: ...ration Transition Instructions Figure 2 3 Assembling the transition side panels with bottom panel Figure 2 4 Field cut holes on the faceplate for installing the fan discharge PNEG 2286 Metric Aeration Transition 15 ...

Page 16: ...duct assembly NOTE After installing the faceplate 11 use shims at the bottom to make the fan discharge flush with the transition assembly 14 Once the flush fit is ensured bolt the fan discharge to the transition faceplate 11 Figure 2 6 Installing the transition top panel 16 PNEG 2286 Metric Aeration Transition ...

Page 17: ...Chapter 2 Aeration Transition Instructions Figure 2 7 Transition and duct assembly dimensions Figure 2 8 Stemwall transition entrance PNEG 2286 Metric Aeration Transition 17 ...

Page 18: ...eration Transition Instructions Figure 2 9 Concrete for standard stemwall transition entrance Figure 2 10 Typical installation of the transition and duct assembly with floor 18 PNEG 2286 Metric Aeration Transition ...

Page 19: ...ration Transition Instructions Figure 2 11 Transition entrance duct cross section for cor perforated floor Figure 2 12 Transition entrance duct cross section for plank floor PNEG 2286 Metric Aeration Transition 19 ...

Page 20: ...ation Transition Instructions Figure 2 13 Installing the post support weldment inside the duct assembly Figure 2 14 Marking the stiffener support post location for anchor bolt 20 PNEG 2286 Metric Aeration Transition ...

Page 21: ...structions Figure 2 15 Installing the base stiffener to the stiffener support using anchor bolt Figure 2 16 Installing the base stiffener to the stiffener support using pre cast long anchor bolt PNEG 2286 Metric Aeration Transition 21 ...

Page 22: ...NOTES 22 PNEG 2286 Metric Aeration Transition ...

Page 23: ...sive remedy for any claimant is set forth in this Limited Warranty and shall not exceed the amount paid for the product purchased This Warranty only covers the value of the warranted parts and equipment and does not cover labor charges for removing or installing defective parts shipping charges with respect to such parts any applicable sales or other taxes or any other charges or expenses not spec...

Page 24: ...ulations which should be carefully followed in all cases Authorities having jurisdiction should be consulted before installations are made 1004 E Illinois St Assumption IL 62510 0020 Phone 1 217 226 4421 Fax 1 217 226 4420 www gsiag com Copyright 2019 by The GSI Group LLC Printed in the Europe CN 358064 ...