- 13 -
STC 4-16 CT CI
3.3 P
otential
equalisation
(Pe)
Equalise the potential (PE) in accordance with IEC/EN/DIN EN 60728.
• Connect the PE connection terminal
1
to a PE rail (supplied by customer)
using the PE wire (Cu 4 mm
2
- 9 mm
2
).
3.4 C
onneCting
the
deviCe
• Connect the SAT IF inputs…
3
vertical low*
4
vertical high*
5
horizontal low*
6
horizontal high*
… to the corresponding outputs of an LNB.
*Factory defaults for the preprogrammed ASTRA reception, can be changed individually.
•
Make sure that all inputs have the same level!
• Connect the attached mains cable to the IEC connector C14
9
.
—> If you would like to integrate the device to an existing plant, now
first you should connect it to the mains and perform all settings (Con-
figuration page 15).
• Connect the mains cable to a mains socket with protective conductor con-
nection. Thereby note the voltage specified on the device.
—> This device has no power switch and starts immediately after con-
necting the operating voltage.
• Configure the device (page 15).
•
If the programming is finished
connect the RF output
7
to the cable net-
work.
—> For multiple satellite reception observe the dCSS/Unicable II mode