- 36 -
PSU 8-16 A
12 f
inal
proCedures
After installing the head-end station, upgrading accessories or installing cas-
settes it is necessary to tighten all cable connections, cable terminals and cover
screws in order to maintain compliance with current EMC regulations securely.
• Securely tighten the cable connections (Cinch, RF connectors) using an ap-
propriate open-ended spanner.
• Hang the front cover into the mounting screws
2
.
• Tighten the mounting screws.
• Attach the locking screws
1
and tighten it
2
2
1
To avoid disturbances and problems in reception in the connected cable net-
work, it is absolutely necessary to adjust the output level of the complete re-
ceiving installation to the necessary linear values (for example FM, 64 QAM
8-16dB and 256 QAM 4-6dB below the analogous level)!