Bit Pad Two 32
Power
The power supply shipped with Bit Pad Two provides the proper power: 300mA at +12VDC
with +/-.5% regulation or better and 100 mA at -12VDC with +/-5% regulation or better.
Section B: Unpacking and Installation
Unpacking
Immediately upon receipt, inspect the package for damage. If damage exists:
1.
Open the package and inspect the damage.
2.
Report the damage to the carrier as soon as possible, preferably within 72 hours or
receipt.
3.
Record the damaged items on the freight bill.
4.
Write to the carrier: state that the shipment was damaged, when it was received and
request an inspection.
5.
Keep the shipment in its original container until an inspection is made by the carrier.
6.
Notify GTCO CalComp by Turning Technologies at 1.866.746.3015 or email us at
gtco.support@gtcocalcomp.com
.
Otherwise, unpack the Bit Pad Two. The package should include:
Tablet with data/power cable attached
Four rubber feet
Bit Pad Two Data Tablet Technical Reference
Power supply
Purchasable options include:
Cursor/Stylus
Gender changer or reversing cable
Power cable (for international power supply)
Summary of Contents for BIT PAD TWO DATA
Page 14: ...Bit Pad Two 14 General Flowchart for Master Program to Read and Process Data Tablet Reports...
Page 15: ...Bit Pad Two 15 Detail A Get and Decode Reports Subroutine...
Page 16: ...Bit Pad Two 16 Detail B Data Input Subroutine...
Page 34: ...Bit Pad Two 34...
Page 42: ...Bit Pad Two 42 Appendix B ASCII Conversion Chart...
Page 43: ...Bit Pad Two 43...
Page 44: ...Bit Pad Two 44...
Page 46: ...Bit Pad Two 46 Switch Settings DIP Switch 1...