Output System Connections
6. Connect the system output cables between the UPS output terminals (X3/L31-L32-L33-N2) Refer to
Fig.4-11
and the critical load and tighten the terminals screws to 5Nm (M6 Bolt) or to 13Nm (M8 Bolt) or to
25Nm (M10 Bolt).
Note: ENSURE CORRECT PHASE ROTATION.
WARNING
If the load equipment will not be ready to accept power on the arrival of the commissioning engineer, then
ensure that the system output cables are safely isolated at their ends.
7. Re-install all the protective covers.