Initial Start-up Procedure for Water Treatment
All Crown Royal Stoves purchases are required to purchase authorized water treatment for initial start-up. With each gallon of
treatment, you will be provided with two sample bottles and furnace information forms.
• Before adding treatme
nt fill furnace with water and circulate for 48 hrs.
• Check for any leaks before adding treatment.
• Add initial dosages of trea
tment for the following models:
o
7200MP
–
Add 3/4 gallon
o
7300MP
–
Add 1 gallon
o
7400MP
–
Add 2 gallons
o
7500MP - Add 3 gallons
• Follow procedure for collecting water sample below.
Procedure for Collecting Water Samples
•
Turn off furnace and circulate for 24 hours to ensure complete mixture of water and treatment.
•
Collection of samples can be done from drain line or other convenient location.
•
Allow 30 seconds of drainage before collection of samples.
•
Use provided 4 oz sample bottle to retrieve water sample.
•
Fill out provided Furnace Information Form and attach to sample bottle.
•
Mail water sample to designated testing facility found on provided Furnace Information Form.
•
Testing facility analyzes the conductivity, PH and nitrate levels of water sample.
•
Testing results are provided on all samples within 4-6 weeks.
•
If testing results are unsatisfactory, recommendations of additional treatment will be given.
•
These recommendations will need to be performed and a retest is required to maintain warranty.
o
Low Levels
–
Additional treatment is to be added to system and a retest is required.
o
High Levels
–
Water will need to be drained and replaced with fresh, untreated water and a retest is required.
When collecting water samples turn off furnace and allow water to reduce in temperature. When water is reduced to a safe
temperature, collect sample.
WARNING!!! Hot water and surfaces may cause burns. Use extreme care with collection of water sample.
Mailing Samples -
Testing results are emailed to customers who provide emails on the Furnace Information form or mailed to the
address given within 4-
6 weeks. It is owner’s respons
ibility to ensure they receive testing results and follow recommendations. When
mailing samples to testing facility it is recommended to mail with tracking capabilities. If test results are not received within 4-6 weeks,
please call 866-361-7355.
Additional Dosage Requirements
• If system/furnace experiences leak or requires water to be added, add
treatment at the rate of ½ oz
per gallon of water added. • If furnace system is drained for any reason, refer to initial
startup procedure of Water Treatment.
FURNACE TREATMENT PROCEDURE
34
Summary of Contents for Crown Royal Stoves Multi-Pass 7200MP
Page 2: ......
Page 4: ......
Page 6: ...6 ...
Page 8: ...8 ...
Page 11: ...FURNACE FLOOR PLAN Model 7200MP Model 7300MP 11 ...
Page 12: ...FURNACE FLOOR PLAN Model 7400MP Model 7500MP 12 ...
Page 22: ...22 ...
Page 30: ...30 ...
Page 31: ...ELECTRICAL WIRING DIAGRAM 7200MP 7300MP 7400MP 31 ...
Page 32: ...ELECTRICAL WIRING DIAGRAM 7500MP 32 ...
Page 38: ...38 ...
Page 42: ...Model 7500MP 42 ...
Page 51: ...51 ...
Page 52: ...OWNER S MANUAL ...