2
GTO 2002XLS Instruction Manual © 01.12.12
Before You Begin...
1. Determine Charging Option for Battery: Transformer OR Solar
NEVER USE TRANSFORMER AND SOLAR PANEL(S) AT THE SAME TIME.
It will damage the control board.
IMPORTANT:
• The 2002XLS’ 12 volt battery must be charged by either connecting the transformer (included) or solar
panel kit [FM122] to the control board.
• The transformer is designed for indoor use. If the transformer can be plugged only into an outside
electrical outlet, a weatherproof cover/housing (available at local electrical supply stores) must be
used.
• If your gate is more than 1000 ft. from an AC power source, you will need to use at least 5 watts solar
charging power to charge the battery [FM122]. Refer to the Solar Panel and Gate Activity chart
below.
• All low voltage wire used with the GTO Gate Operator must be 16 gauge dual conductor, stranded,
direct burial wire [RB509].
Do not run more than 1000 ft. of wire.
Winter Ratings for 12 V Single Gate
Zone 1
Zone 2
Zone 3
5 watts
4
8
13
10 watts
8
16
26
15 watts
11
20
30
20 watts
14
28
38
The table and map
illustrate the maximum
number of gate cycles
to expect per day in a
particular area when
using from 5 to 20 watts
of solar charging power.
The figures shown are
for winter (minimum
sunlight).
Accessories connected to your
system will draw additional power
from the battery.
10 Watt Solar Panel [FM123]
5 Watt Solar Panel [FM122]
Solar Panel and Gate Activity Chart