34
Step 3
With the gate in the
fully closed position
and the operator retracted, swing the operator to the gate. Mark reference points for
bolt holes on gate cross member through middle of gate bracket slots. The operator must be level. (Some vertical adjustment
is possible by sliding the post bracket assembly up and down.) Drill
3
/
8
" holes into the gate cross member as marked. Fasten
gate bracket to cross member using (2) 3/8" x 3" bolts, washers, lock washers, and nuts. Attach the operator to the post
bracket assembly and gate bracket using clevis pins, bushings, and hairpins clips.
Step 4
Make sure the control box power switch is
OFF
. Use a small
screwdriver to move the
Number 4
DIP switch from the factory
setting (OFF / Pull-To-Open) to
ON for Push-To-Open
. Turn
power switch
ON
. The control board is now configured to
push
the gate open.
Setting the Open Position Limit
In a PUSH-TO-OPEN Installation Your GTO/PRO® 3200 has two Limit Settings
1)
CLOSED Limit setting:
(Gates in the CLOSED POSITION / FACTORY SET NOT ADJUSTABLE) The closed limit
setting in the closed position.
2)
OPEN Limit setting:
(Gates in the OPEN POSITION) To achieve optimum open position, you are required to complete
the following SEVEN STEPS:
Step 1
Confirm that the power switch is in the ON position, and the gates are in the CLOSED POSITIONS.
Step 2
Activate your operators by pressing the entry transmitter button. Your gates should now be moving from the closed positions
toward their open position. Prepare to STOP gates by pressing the entry transmitter button again when the first gate reaches
the desired open position. This step may be repeated until desired close position is achieved. Once the desired OPEN
position has been achieved, proceed to step 3.
Step 5
Install the second gate operator on the other gate in the same
manner. Then refer to the CONTROL BOARD SETTINGS on
page 26 for gate sequencing and other programming steps before
proceeding.
1
ON
2 3 4 5 6 7
ON
OFF
1 2 3 4 5 6 7
DIP#4
ON
Push-to-open operation.
OFF
Pull-to-open operation (factory setting).
GRN
BLK
RED
RECEIVER
COM
COM
CYCLE
CLOSE
SAFETY
EXIT
OPEN
SHADOW
LOO
P
CLOSE
EDGE
OPEN
EDGE
Operator
Fence Post
Gate Post and Gate Cross Member
(In Closed Position)
POST PIVOT BRACKET level with the
horizontal surface of the GATE BRACKET
LEVEL
LEVEL
LEVEL