At this stage of the installation, the operator should be installed on
the gate and the closed position stop should be in place.
Check List
• The gate is plumb, level, and swings smoothly on its hinges.
• A plate or support was added for the gate bracket (if necessary).
• The operator is level and mounted on the centerline of the gate.
Mounting the Control Box
Step 13
Mount the control box using the screws (
provided
) or another
secure mounting method. The control box must be mounted at
least
3 feet above the ground
to protect it from rain splash, snow,
etc., and at least
3 feet from an AC power source to prevent
electrical interference
.
Use mounting
holes and screws
provided to mount
control box to a
secure surface.
1Z]aSR>]aWbW]\Ab]^>ZObS
5ObS7\1Z]aSR>]aWbW]\
CL
NOTE:
The battery that came with your GTO/PRO®
2000XL,
MUST
be placed in the top (horizontal)
battery slot with the terminals on the
RIGHT
. The
extra (vertical) battery slot is for an optional second
battery. An optional second battery is recommended for
solar and/or high traffic applications, if needed.