background image

2.3.2 Installation with screw mounting 
 
If the GTTS-2000B should be installed using 4 pieces M5 bolts, the bolts shall not be longer then 18mm plus 
the steel surface thickness. 
Drill 4 holes Ø 5,5 mm according the drill plan. See figure below 
 
 
 

 

 
 
 
X is steel surface thickness 

 

 

 

 

 

 

 

Bolt M5  maximum length is X+18 mm 
 

Make sure that bottom center touches steel.

 The ferro sensor is located at this position. 

 

Reviews: