4
Table of Contents
Pre-Installation Notes
4
Important Notices
5
Installation Instructions
6
Connectors
7
Setting Direction of Operation
8
Setting UP-Limit
9
Setting DOWN-Limit
10
Sensitivity Auto-Learning
11
Manual Sensitivity Adjustment (For Installers Only)
12
Programming Transmitter
13
Setting Auto-Closing Timer
14
Trouble-Shooting
15
Parts Breakdown
16
Parts List
17
Warranty
18
Pre-Installation Notes
The operator may be fitted to either the RIGHT or LEFT hand side of the roller door.
Check that there is sufficient side clearance to fit the operator unit as below listed:
Door Type
Minimum side clearance
“A” Series (1) (25mm deep tracks)
90mm
“AA” Series (2) (50mm deep tracks)
115mm
All doors with Windlock Tracks subject to Drum Position
140mm
Ensure there is a properly earthed mains supply socket adjacent to where the operator is to be fit-
ted.
If the operator is being fitted at the same time as the new door installation, read these instructions in
conjunction with the door installation instructions.
If the operator is being retro-fitted, make sure the door operates smoothly and is properly balanced.
N.B.: SPECIAL CARE SHOULD BE TAKEN IF RE-TENSIONING OF THE DOOR IS REQUIRED.
Summary of Contents for DCR2
Page 20: ......