OPERATION
17
DC Voltage Measurement
Wire Connection
Diagram
Steps of
Measurement
1.
Insert the red test lead into the
or
terminal, and black test lead into the COM
terminal.
2.
Turn the function dial to the
,
, or
position.
3.
Short press the SELECT button to switch to
DC voltage SELECT measurement if required.
4.
Connect the test leads with the measured load
or power supply in parallel.
5.
Read the voltage value on the display (if the
voltage is >1000V, the red indicator light will
be on and the buzzer will sound an alarm).