OPERATION
21
LoZ (low impedance) ACV Measurement
(GDM-533)
Wire Connection
Diagram
Steps of
Measurement
1.
Insert the red test lead into the or
terminal, and black test lead into the COM
terminal.
2.
Turn the function dial to the
position.
3.
Connect the test leads with the measured load
or power supply in parallel.
4.
Read the voltage value on the display.
5.
Short press the
button to display the
frequency/duty ratio of the measured voltage.