PEL-3000(H) User Manual
96
5.
Set the Delay Time.
The delay time setting will delay activating the
Go-NoGo testing by a specified amount of time.
The delay setting can compensate for startup
oscillation and other instabilities during
startup.
Delay Time
0.0-1.0 seconds (0.1s resolution )
Note
When the Main settings are saved or recalled, the Go-
NoGo settings are also saved/recalled. See the
Save/Recall chapter for details, page 98.
Running a Go-NoGo Test
Description
Go-NoGo test results are displayed in the
measurement panel.
GO indicates pass (good).
NG indicates fail (no good).
Operation
1.
Press
Main
>
Configure[F5]
>
Go-NoGo[F3].
2.
Set
SPEC Test
to ON.
When SPEC Test is ON, SPEC will appear in the
Operation Status Panel. This means the unit is
ready for Go-NoGo testing.
3.
Turn the load on.
The test starts from the time the load was
turned on + the Delay Time.
Display:
GO
0.000
V
0.0000
A
0.00
W
Level2
0.00
Level1
0.00
LOAD
RS232
01/Oct/2018
W
W
SPEC test = ON
SPEC
GO
Test result
Summary of Contents for PEL-3000 Series
Page 1: ...DC Electronic Load PEL 3000 H Series USER MANUAL VERSION 2 00 ISO 9001 CERTIFIED MANUFACTURER ...
Page 24: ...PEL 3000 H User Manual 22 PEL 3111H PEL 3211 Booster Pack PEL 3211H Booster Pack ...
Page 41: ...GETTING STARTED 39 Fasteners 2 ...
Page 207: ...REMOTE CONTROL 205 6 7 8 9 The function check is complete ...
Page 229: ...APPENDIX 227 Operating Area PEL 3021 ...
Page 230: ...PEL 3000 H User Manual 228 PEL 3041 ...
Page 231: ...APPENDIX 229 PEL 3111 ...
Page 232: ...PEL 3000 H User Manual 230 PEL 3211 Booster Pack PEL 3021H ...
Page 233: ...APPENDIX 231 PEL 3041H ...
Page 234: ...PEL 3000 H User Manual 232 PEL 3111H PEL 3211H Booster Pack ...
Page 235: ...APPENDIX 233 ...