7
Castors are provided on the QUICK LIFT to move the ramps easily and to allow them to be properly positioned under
the vehicle. Use the handles to carry the ramps one by one more easily.
Step 2: Place the hydraulic power pack at least 2 meters away from the ramps without connecting it
electrically. Attach the long hydraulic hoses to the hydraulic power pack. Do not overtighten, the sealing
is done automatically with the conical seat of the connections.
Step 3: The tank of the hydraulic unit is empty. It must be filled with hydraulic oil or automatic
transmission fluid before starting operation. Approved fluids are general purpose hydraulic oils or
synthetic automatic transmission oils with a viscosity index of 32 cSt at 40°C.
Remove the fuel filler cap and fill it with up to 3.5L of oil through a clean funnel. Check the level and adjust if
necessary.
Electrical outlet
Wired telecom
Hydraulic power pack
Long hydraulic hoses (X2)
Casters
Locking bar
(On the outside)
Locking bar
(On the outside)
Short hydraulic hoses (X2)
Transport
handles
Summary of Contents for LUXMAIN QUICK LIFT L520E
Page 17: ...17...