5
Installation tools
Installation accessories
Pre-installation checklist
Table 4
Pre-installation checklist
Item Requirements
Result
Installation site
Ventilation
•
There is a minimum clearance of 10 cm (3.94 in)
around the inlet and outlet air vents for heat
dissipation of the router chassis.
•
A good ventilation system is available at the
installation site.
Summary of Contents for MSR 26-00-10
Page 16: ...9 Figure 2 Installation flow ...