background image

2

1

H3C MSR2600-6-X1[2600-15-X1] Gigabit Ethernet Integrated Service Gateways Installation Quick Start-5W102
H3C MSR2600-6-X1[2600-15-X1]

-5W102

Installation accessories

When working with the gateway, always wear an ESD wrist strap, and make sure the 
strap makes good skin contact and is reliably grounded.

操作者需佩戴防静电腕带,确保防静电腕带与皮肤良好接触,并确认防静电腕带已经良
好接地。

The installation tools are not provided with the gateway. Prepare them yourself as 
required.

路由器不随机提供安装工具,请用户根据实际安装需求自己准备安装工具。

Mounting the gateway on a workbench

Tool list

!

Cage nut (user supplied)

浮动螺母

(

用户自备

)

Grounding cable

接地线

4 × M6 screws (user supplied

for the MSR2600-15-X1)

M6 

机柜螺钉

×4

MSR2600-15-X1

需要用户自备)

Mounting brackets

挂耳

4 × M4 screws

M4 

挂耳螺钉

×4

Flathead 

screwdriver

一字螺丝刀

Phillips 

screwdriver

十字螺丝刀

Needle-nose 

pliers

尖嘴钳

Wire-stripping 

pliers

剥线钳

ESD wrist strap

防静电腕带

Diagonal pliers

斜口钳

Heat gun

热风枪

Network cable 

tester

测线仪

Multimeter

万用表

Marker

记号笔

Make sure the air inlet and outlet vents of the gateway are not blocked and the installation site 
has a good ventilation system.

The gateway uses left-to-right air aisles.

请确保路由器的进、出风孔不被遮挡,并将路由器安装在具有良好通风散热系统的环境中。

MSR2600-6-X1/2600-15-X1

路由器采用左进右出的风道设计。

Airflow of the gateway

Rubber feet 

脚垫

Cable tie 

扎带

Power cord

电源线

Console cable

配置电缆

Reviews: