2-5
•
The rack for the switch has a good cooling system.
•
The installation site has a good cooling system.
•
Verify that the airflow design of the chassis meets the airflow design of the installation site.
Figure2-1 Airflow through the switch (S12508G-AF switch)
(1) Chassis air intake direction
(2) Chassis air exhaust direction
Space
For easy installation and maintenance, follow these space requirements:
•
Reserve a minimum clearance of 1.2 m (3.94 ft) between the rack and walls or other devices.
•
Make sure the rack has enough space to accommodate the switch.
For more information about switch dimensions and rack requirements, see "Switch dimensions
and rack requirements."
Installation accessories
Before installation, make sure you have all the required installation accessories.
Table2-3 Installation accessories
Product code
Description
Quantity
Applicable
device models
2150A08S
S12516G-AF mounting brackets
1 pair
S12516G-AF
1
1
2
2
Summary of Contents for S12500G-AF Series
Page 32: ...3 15 Figure3 16 Connecting the grounding cable to a grounding strip 1 2 4 3 6 5 ...
Page 49: ...4 16 Figure4 16 Connecting an SFP DAC cable 1 Pull latch 2 Connector 1 2 ...
Page 92: ...A 12 FigureA 14 Example of a device label ...
Page 104: ...C 6 FigureC 5 Securing the chassis to the pallet base S12504G AF switch 1 1 2 2 1 ...