3-1
3
Installing the switch
IMPORTANT:
Keep the packages of the switch and the components for future use.
Confirming installation preparations
Before you install the switch, verify that:
•
You have read "Preparing for installation" carefully and the installation site meets all the
requirements.
•
A 19-inch rack is ready for use and the rack has enough space to accommodate the switch.
For information about how to install a rack, see the rack installation guide.
•
The rack is sturdy and reliably grounded.
•
No debris exists inside or around the rack.
•
The heaviest device is placed at the bottom of the rack.
•
The rack power supplying capabilities meet the device requirements. For information about the
system power consumptions, module power consumptions, and power module specifications,
see
H3C S12500G-AF Switch Series Hardware Information and Specifications.
•
The total height of the switches to be installed is not higher than the available installation height
of the rack and enough clearance is reserved for cable routing.
•
The switch is ready for installation and has been carried to a place near the rack and convenient
for moving.
Summary of Contents for S12500G-AF Series
Page 32: ...3 15 Figure3 16 Connecting the grounding cable to a grounding strip 1 2 4 3 6 5 ...
Page 49: ...4 16 Figure4 16 Connecting an SFP DAC cable 1 Pull latch 2 Connector 1 2 ...
Page 92: ...A 12 FigureA 14 Example of a device label ...
Page 104: ...C 6 FigureC 5 Securing the chassis to the pallet base S12504G AF switch 1 1 2 2 1 ...